Daye Porcelain Start a project

FACTORY RESOURCE MANAGEMENT

Better decisions
start with evidence.

Explore the factory resource initiatives documented in the 2024 profile, then request current information for your supplier assessment.

Solar panels on the Daye factory roof

WHAT YOUR BUYING TEAM NEEDS TO KNOW

Resources, records
and relevant evidence.

01

Energy initiatives

The profile documents rooftop solar installation at the factory. Current operating data should be requested for a present-day assessment.

02

Water circulation

Workshop wastewater filtration and circulation are shown as part of the factory’s resource management measures.

03

Project decisions

Packaging, product durability and purchasing specifications are additional topics to review for your own program.

01 / ROOFTOP SOLAR

A visible investment
at the factory.

The factory photographs show rooftop solar panels and related equipment. They provide evidence of the installation documented in the company profile.

For a quantified energy assessment, request the current reporting period, measurement basis and relevant operational data. The website does not infer a carbon footprint from the presence of solar panels.

Close view of the factory rooftop solar panels
Factory water treatment equipment

02 / WATER SYSTEMS

Filtration and circulation
within the workshop.

The profile describes workshop wastewater treatment and water circulation. The photographs document the equipment associated with that initiative.

Ask for the current system scope and records required by your supplier policy. Historical profile statements should be checked before they are used in your own sustainability reporting.

BUYER’S WORKING CHECKLIST

A brief with fewer unknowns.

DecisionWhat to defineWhy it matters
Reporting periodDates covered by operational informationPrevents historical data being treated as current.
BoundaryFacility, process and resource measuredMakes the scope of a claim clear.
EvidenceMethod, records and review responsibilitySupports a traceable supplier assessment.
PackagingProtection needs and material preferencesBalances product protection with the brief.
Product lifeUse requirements and relevant performance testsConnects durability goals with product evaluation.

FROM REVIEW TO RELEASE

A clear route to approval.

01

Define

Send your supplier environmental questionnaire or reporting needs.

02

Identify

Match each question with the relevant factory information.

03

Review

Check dates, scope and measurement assumptions.

04

Apply

Use only the supported information in your procurement decision.

03 / MATERIAL RECOVERY

Look closely at
material recovery.

The company profile documents material recovery within the ceramic production process. Ask how recovery is managed for the relevant process and what evidence can support your specific sourcing requirements.

Avoid broad environmental claims for a new product until the relevant materials, manufacturing information and evidence have been reviewed.

Workshop operator handling recovered material from the filtration process

PROCUREMENT QUESTIONS

The details worth asking.

Is every product carbon neutral?

No such claim is made. Any product-level carbon claim requires a defined assessment and supporting evidence.

Can we request current resource data?

Yes. Specify the reporting period, facility boundary and metrics your supplier assessment requires.

Do solar panels establish renewable-only production?

No. An installation photograph does not establish the factory’s full energy mix. Request current operational information for that question.

Can packaging be adapted to our requirements?

Discuss material preferences, retail presentation and protection needs with the project team. The final packing solution should be assessed for the product and delivery route.

CONTINUE YOUR EVALUATION

Build the complete picture.

01

Factory audits

Connect environmental questions with supplier review.
Explore factory audits

02

Testing laboratory

Review performance requirements for product use.
Explore testing laboratory

03

Manufacturing

Understand the production route and where consistency is controlled.
Explore manufacturing

LET’S BUILD YOUR NEXT PROGRAM

A clearer brief.
A better starting point.

Send your design files, estimated quantities and target market. We will use your brief to define the development and production scope.